PROJECTS & STUDIES: Active Projects > SR 528 Widening

Contact: Sarah Kraum

528 Widening
Project Limits: Industry Road to SR 3 and SR 3 to Port Canaveral Interchange 

Industry Road to SR 3
This project includes widening and reconstruction of State Road (S.R.) 528 (S.R. A1A/Martin Andersen Beachline Expressway/Astronaut Boulevard) from four to six lanes from east of S.R. 524 to east of S.R. 3. The project includes replacement of the bridges over U.S. 1, S.R. 3, the Indian River Relief Canal, and the westbound bridge over the Indian River. A shared-use trail is also included on the north side of S.R. 528. 

SR 3 to Port Canaveral Interchange
This project involves adding one lane in each direction, and a multi-use trail on the north side of State Road (S.R.) 528 (S.R. A1A/Martin Andersen Beachline Expressway/Astronaut Boulevard) from east of S.R. 3 to the Port Canaveral exit/S.R. 401 interchange.Improvements are also proposed at Banana River Drive, S.R. 401 and George King Boulevard interchanges with S.R. 528. The project also includes the following bridge replacements: Sykes Creek, Banana River Drive, Banana River Relief, Banana River and S.R. 401. 

The widening of SR 528 to six lanes is currently in the design phase.

  • Project Summary: Widening will allow for more efficient access to and from the Port. It will also feature a recreational multi-use trail. 
  • Project Status: Design
  • Unfunded Phase: Right of Way (partially) and Construction
  • Additional Information: Water quality study and discussions are wrapping up

Project Documents & Resources: 

SR 528