2035 Adopted Long Range Transportation Plan

The final adopted 2035 Long Range Transportation Plan (LRTP) is very large. It has been divided into the following sections for faster downloading.

Executive Summary: Overview of Development Process, Anticipated 2035 System Capacity, 2035 Transportation System Needs, Needs Plan Cost Estimates, Financial Resources, and Cost Feasible Plan.

Mobility Assessment: About The SCTPO, About the LRTP, LRTP Planning Factors, Goals, Objectives, Performance Measures, and Targets, Community Engagement, Socio-Economic Conditions and Trends, Transportation System Performance, Congestion Reduction Strategies, Needs Plan, Needs Plan Cost Estimates, and Anticipated Financial Resources.

2035 Transportation Plan: Introduction, Cost Feasible Plan, Streets and Highways Element, Transit System Element, Bicycle, Pedestrian and Trails Element, Freight and Goods Movement Element, Congestion Management Element, Transportation System Safety Element, and Transportation System Security Element.

Complete 2035 without Appendices: File is 6MB

Complete 2035 LRTP with Appendices: File is 25 MB and 426 pages. It will take some time to download.

2035 LRTP Amendment 1

Appendices

Appendix-A: Adoption Resolution

Appendix-B: Goals, Objectives, Measures, and Targets

Appendix-C: Public Participation Plan

Appendix-D: Community Engagement

Appendix-E: FDOT Model Calibration & Validation Results

Appendix-F: FLUAM LRTP SE Data Documentation

Appendix-G: SCTPO Socio-Economic Data

Appendix-H: Financial Resources

Appendix-I: Bicycle & Pedestrian Maps

 

 

1 Response

  1. August 18, 2014

    […] Included in the LRTP is a projection of anticipated transportation funding and projected costs. Because funds are limited, public input is essential to help identify the priority projects that will be included in the plan for implementation. The LRTP may be amended periodically as a result of changes in projected federal, state, and local needs or funding. The public has the opportunity to provide input throughout the planning process which takes up to two years. The LRTP has its own public participation plan which may include a project website, a survey to gather broad input, and special public hearings. There is a 30 day public comment period prior to plan adoption and continuously during the two year planning process. The TPO is currently operating on the 2035 Adopted LRTP. […]