Eau Gallie Beachside Corridor Planning Study

Contact: Georganna Gillette

The Eau Gallie Beachside Corridor Planning Study is designed to evaluate possible safety and multimodal transportation improvements along the 1.4 mile section of SR 518 (Eau Gallie Boulevard) between the Eau Gallie Causeway Bridge and SR A1A.

TPO Board PowerPoint Presentation (March 10, 2016)

A public kickoff meeting was held on April 29, 2015. The study is estimated to take 18 months to complete.

Kickoff Meeting Announcement
Public Kickoff Meeting Presentation
Existing Conditions Summary

More information is available at the FDOT Project website.