Viera Boulevard Interchange

Contact: Georganna Gillette

Viera Boulevard Website

A Project Development and Environment (PD&E) Study is investigating a proposed interchange at I-95 and Viera Boulevard. The study is also analyzing the potential widening of Viera Boulevard in two sections: from Tavistock Drive to west of Porada Drive and from east of Herons Landing Drive to east of Holiday Springs Road.

At a public hearing on May 20, 2014, a Diverging Diamond was suggested as the best alternative for the proposed interchange. The video below shows a simulation of traffic and pedestrian flow through a Diverging Diamond Interchange.

Design of the interchange is funded in fiscal year 2016 and construction is scheduled for fiscal year 2017. The widening of Viera Boulevard is scheduled to begin within six months of completion of the new interchange.