SR 528 Detour at SR 407 November 9 to 20

A major detour is set to begin at SR 528 and SR 407 as part of the roadway paving project on SR 407 from SR 528 to SR 405/Columbia Boulevard. P&S Paving, Inc. is performing the work under contract with the Florida Department of Transportation.

The nightly SR 528 off and on ramp closures onto and from SR 407 are planned for 8 pm to 5 am on Sunday, November 9 through Thursday, November 13 and Sunday, November 16 through Thursday, November 20.

Download detailed detour information from FDOT and a detour map.